LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Actual performance analysis of a double shield TBM through sedimentary and low to medium grade metamorphic rocks of Ghomrood water conveyance tunnel project (lots 3 and 4)

Photo from wikipedia

In this paper, after a brief description of engineering geological properties of Ghomrood water conveyance tunnel project (lots 3 and 4 with a total length of 18 km), the actual performance… Click to show full abstract

In this paper, after a brief description of engineering geological properties of Ghomrood water conveyance tunnel project (lots 3 and 4 with a total length of 18 km), the actual performance of the machine during the excavation of tunnel through sedimentary and low to medium grade metamorphic rocks has been analyzed. Subsequently, using data collected during pre-construction and construction phases of the project, the relationships between rock mass properties and measured machine performance parameters have been investigated and proposed as a prediction model which can be used in future projects in which similar geological conditions are encountered. Results of analyses indicated that there are strong relationships between TBM performance and engineering geological conditions of the tunnel alignment.

Keywords: water conveyance; tunnel; tunnel project; ghomrood water; performance; conveyance tunnel

Journal Title: Bulletin of Engineering Geology and the Environment
Year Published: 2020

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.