LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Effect of design and operational parameters on nutrients and heavy metal removal in pilot floating treatment wetlands with Eichhornia Crassipes treating polluted lake water

Photo from wikipedia

Though having an economic and ecological impact on Marriott Lake management in Egypt, water hyacinth (Eichhornia crassipes) is an aquatic floating macrophyte with a known phytoremediation potential. In order to… Click to show full abstract

Though having an economic and ecological impact on Marriott Lake management in Egypt, water hyacinth (Eichhornia crassipes) is an aquatic floating macrophyte with a known phytoremediation potential. In order to assess its remediation potential, pilot floating treatment wetlands (FTWs) with E. crassipes were built in duplicates to evaluate the removal of nutrients and heavy metals from the polluted lake water. The experimental design included units with different water depths (15, 25, and 35 cm; D15, D25, and D35, respectively) and plant coverage (90, 70, 50, and 0%; P90, P70, P50, and P0, respectively). The pilot FTWs were monitored over a 7-day operation cycle to identify the optimum combination of design (plant coverage, water depth) and operation (hydraulic retention time; HRT) parameters needed for maximum BOD5, TN, NH4-N, and TP removal. NH4-N removal reached 97.4% in the D25P50 unit after 3 days, BOD5 75% in the D15P90 after 3 days, TN 82% in the D25P70 after 4 days, and TP 84.2% in the D35P70 after 4 days. The open-water evaporation rate was higher than the evapotranspiration rate in the planted units, probably due to the warm climate of the study area. Metals were also sufficiently removed through bioaccumulation in plant tissues in the order of Fe > Pb > Cu > Ni (62.5%, 88.9%, 81.7%, and 80.4% for D25P50, D25P70, D25P50, and D25P90, respectively), while most of the assimilated metal mass was translocated to the plant roots. The biochemical composition of the plant tissue was significantly different between the shoot and root parts. Overall, the FTW with 70% E. crassipes coverage, 25-cm water depth, and an HRT of 3–5 days was identified as the optimum design for effective remediation of the polluted Marriott Lake in Egypt.

Keywords: plant; water; removal; eichhornia crassipes; pilot floating; design

Journal Title: Environmental Science and Pollution Research
Year Published: 2021

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.