LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Preventative Metallurgical Failure Evaluation of Free Power Turbine Nozzle of Aero-Derivative Gas Turbine Engine

Photo from wikipedia

A set of free power turbine first stage nozzle guide vanes (NGVs) was investigated with the objective of extending its service life after completing 100,000 operating hours. The investigation covered… Click to show full abstract

A set of free power turbine first stage nozzle guide vanes (NGVs) was investigated with the objective of extending its service life after completing 100,000 operating hours. The investigation covered material microstructure examination, mechanical properties, physical parts visual inspection as well as predicting the formation of deleterious phases. New and removed from service NGVs were used as investigation vehicles with testing specimens taken from the NGV root, 10, 50 and 90% span wise direction. Optical microscopy, scanning electron microscopy and XRD were used in the analysis. The investigation concluded that there were no secondary phases formation due to the operation in the as-removed NGV and Nv for both new and as removed from service NGVs were below the specific superalloy Nv limit.

Keywords: turbine; free power; microscopy; power turbine; failure

Journal Title: Journal of Failure Analysis and Prevention
Year Published: 2019

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.