A simulation-based decision-making framework for construction supply chain management (SCM)

Photo from wikipedia

The conventional economic order quantity (EOQ) model used for calculating re-order point in construction material procurement cycle is fundamentally limited by the assumed constant lead time. In real construction scenario,… Click to show full abstract

The conventional economic order quantity (EOQ) model used for calculating re-order point in construction material procurement cycle is fundamentally limited by the assumed constant lead time. In real construction scenario, the lead time is hardly ever constant. This study uses a PERT-based simulation model to calculate optimum re-order point and order size with an objective of minimizing the average inventory level and downtime due to non-availability of material. The simulation is run on the STROBOSCOPE simulation framework developed by the researchers at the University of Michigan. The duration data collected from a construction project are used to model each step of the procurement process. The results from the simulation are analyzed to study the relationships between order size, re-order point, average inventory level and work–idle time. A decision-making framework is proposed to choose the optimum order size and re-order point (minimum inventory threshold) for efficient use of storage space and minimum idling.

Keywords: order; construction; making framework; simulation; decision making; order point

Journal Title: Asian Journal of Civil Engineering
Year Published: 2019

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.