LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Hydrometallurgical recovery of lead from direct-to-blister copper flash smelting slag

Photo from wikipedia

Abstract Furnace slag from direct-to-blister smelting of copper concentrates contains 12–15% of copper and 2.5–4% of lead. In this form it cannot be deemed as waste material, and thus it… Click to show full abstract

Abstract Furnace slag from direct-to-blister smelting of copper concentrates contains 12–15% of copper and 2.5–4% of lead. In this form it cannot be deemed as waste material, and thus it is subjected to a high-temperature process of slag decopperization; after this, converting process is performed on the Cu–Pb–Fe alloy being the product of decopperization process in electric furnace. An interesting alternative to the presently used processing of flash smelting slag would be its hydrometallurgical processing and selective recovery of Pb and Cu. This paper presents the results of laboratory tests on flash smelting slag leaching with acetic acid solutions and acetic acid with urea additive. The experiments performed allowed to optimize the process parameters to such an extent that Pb content in the post-leaching sediment is practically equal to the value obtained through the high-temperature process performed in electric furnace.

Keywords: smelting slag; process; direct blister; flash smelting

Journal Title: Archives of Civil and Mechanical Engineering
Year Published: 2017

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.