Abstract Construction of RC frame requires a considerable amount of reinforcement steel bars. Shaping market length rebars to get design lengths leads to the production of waste. The purpose of… Click to show full abstract
Abstract Construction of RC frame requires a considerable amount of reinforcement steel bars. Shaping market length rebars to get design lengths leads to the production of waste. The purpose of this research is to optimize the use of available market length rebars in such a way that will generate the least possible waste. Accordingly, Building Information Modeling (BIM) based automated framework integrated with Mixed-Integer Linear Programming (MILP) has been presented in this article. This methodology involves extracting reinforcement detailing data automatically during the design phase using BIM. Then, implementing the column generation algorithm to generate only necessary cutting patterns. Then, optimizing the use of market length rebars by applying the MILP approach. An RC frame of a three-storied building has been analyzed to evaluate the efficiency of the proposed framework. The results show that a substantial amount of trim waste reduction can be achieved quickly and efficiently by the suggested method.
               
Click one of the above tabs to view related content.