Abstract Repetitive scheduling (RS) using conventional methods suffers from many drawbacks due to forced resource continuity assumptions that increase time and cost. Moreover, it leads to an increased work-in-progress (WIP)… Click to show full abstract
Abstract Repetitive scheduling (RS) using conventional methods suffers from many drawbacks due to forced resource continuity assumptions that increase time and cost. Moreover, it leads to an increased work-in-progress (WIP) inventory of units as a result of the unit's idle time between successive activities. Interruption-based RS techniques were introduced to reduce project duration, however, they didn't address WIP inventory and its repercussions. Accordingly, this research developed a new lean-driven Pull-Batch-based Repetitive Scheduling (PBRS) technique that utilizes batch- and pull-production lean concepts to reduce WIP, time, and cost. It has a built-in multi-objective optimization algorithm to determine the optimum number of batches and crews that minimizes time and cost considering the counter impact of resource and unit idleness. A real case study was used to evaluate the performance of the new PBRS technique against the existing ones. The results demonstrated the PBRS superiority and the optimization model's capability to generate optimum schedules.
               
Click one of the above tabs to view related content.