As a result of a much needed paradigm shift worldwide, treated saline water is being considered as a viable option for replacing freshwater resources in agricultural irrigation. Vastly produced geothermal… Click to show full abstract
As a result of a much needed paradigm shift worldwide, treated saline water is being considered as a viable option for replacing freshwater resources in agricultural irrigation. Vastly produced geothermal brine in Turkey may pose a significant environmental risk due to its high ionic strength, specifically due to boron. Boron species, which are generally found uncharged in natural waters, are costly to remove using high-throughput membrane technologies such as reverse osmosis. Recent advances in bioelectrochemical systems (BES) has facilitated development of energetically self-sufficient wastewater treatment and desalination. In this study, removal of boron from synthetic solutions and real geothermal waters, along with simultaneous energy production, using the microbial desalination cell (MDC) were investigated. Optimization studies were conducted by varying boron concentrations (5, 10, and 20 mg L-1), air flow rates (0, 1, and 2 L min-1), electrode areas (18, 24, 36, and 72 cm2), catholyte solutions, and operating modes. Even though the highest concentration decrease was observed for 20 mg-B L-1, 5 mg-B L-1 concentration experiment gave the closest result to the 2.4 mg-B L-1 limit value asserted by WHO. Effect of electrode surface area was proven to be significant on boron removal efficiency. Employing the optimum conditions acquired with synthetic solutions, boron and COD removal efficiencies from real geothermal brine were 44.3% and 90.6%, respectively. MDC, being in its early levels of technology readiness, produced promising desalination and energy production results in removal of boron from geothermal brine.
               
Click one of the above tabs to view related content.