LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

A systematic approach to find the best road map for enhancement of a power plant with dew point inlet air pre-cooling of the air compressor

Photo from wikipedia

Abstract Dimensional characteristics and operating parameters of the optimized Maisotsenko indirect evaporative cooler for pre-cooling of the compressor’s inlet air and consequently enhancement of the gas-turbine power generation system as… Click to show full abstract

Abstract Dimensional characteristics and operating parameters of the optimized Maisotsenko indirect evaporative cooler for pre-cooling of the compressor’s inlet air and consequently enhancement of the gas-turbine power generation system as well as the best investment strategy for it were found for an in-operation combined cycle power plant through a systematic approach. Four optimization scenarios were proposed considering different combinations of annual average of net power of the gas-turbine power generation system, payback period time and enthalpy difference of exhaust gases compared to the reference state of each gas-turbine power generation system as objective functions. In each scenario, optimization was conducted for different possible percentages of investment allocated to the research and development of the project. After that, analytical hierarchy process was used to find the best percentage of investment allocated to the research and development of the project of each scenario and the final selected one. Having introduced the approach, it was implemented for Montazer-Ghaem combined cycle power plant in Iran. The results showed for that case study, the analytical hierarchy process selected an optimization scenario in which the annual average of the net power and the enthalpy difference of the exhaust gases compared to the reference state were the objective functions and 15% of the total profit of the gas-turbine power generation system sold electricity was dedicated to the improvement project. This optimization had the payback period time of 2.67 years and it also improved the annual average of the net power of gas-turbine power generation system and enthalpy difference of the exhaust gases compared to the reference state 6.02 and 8.92%, respectively.

Keywords: generation system; power; air; turbine power; power generation; gas turbine

Journal Title: Energy Conversion and Management
Year Published: 2017

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.