LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Life cycle assessment of a geosynthetic-reinforced soil bridge system – A case study

Photo from wikipedia

Abstract Road infrastructures are a very important component of the world's total transportation network. Investment in its construction and maintenance is significant on a global scale. The paper presents some… Click to show full abstract

Abstract Road infrastructures are a very important component of the world's total transportation network. Investment in its construction and maintenance is significant on a global scale. The paper presents some results from an environmental study of a geosynthetic-reinforced soil integrated bridge system. The Pavlovski potok stream in Slovenia was used as a demonstration case for this study. It is the first GRS bridge system with full-height rigid (FHR) facings in Europe. It was constructed at the end of 2014. The goal of these analyses was to compare two different types of bridges: the new GRS bridge system, which is comprised of a simple girder partially structurally integrated to FHR facings of GRS bridge abutments and a conventional reinforced concrete road bridge. The results of an environmental life cycle assessment (LCA) show that the GRS bridge system has a much lower environmental impact than an equivalent bridge conventionally built with reinforced concrete.

Keywords: bridge system; case study; geosynthetic reinforced; bridge; reinforced soil

Journal Title: Geotextiles and Geomembranes
Year Published: 2018

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.