LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Best Estimate Plus Uncertainty (BEPU): Status and perspectives

Photo by niklas_hamann from unsplash

Abstract The Best Estimate Plus Uncertainty (BEPU) constitutes an approach, a procedure or a framework aimed at making feasible the application of nuclear thermal-hydraulics to the licensing and the safety… Click to show full abstract

Abstract The Best Estimate Plus Uncertainty (BEPU) constitutes an approach, a procedure or a framework aimed at making feasible the application of nuclear thermal-hydraulics to the licensing and the safety evaluation processes of Nuclear Power Plants (NPP). The features of BEPU are such to make attractive its use to address any design and operational issue in NPP technology. BEPU is also the tip of the iceberg of competence in nuclear thermal-hydraulics or a cross-way into the thermal-hydraulics universe. The triggering idea for BEPU came from the adoption of Best Estimate system thermal-hydraulics (SYS TH) codes for accident analysis in water cooled nuclear reactors. The development of BEPU implies interactions between deterministic and probabilistic analyses also recognized as Deterministic Safety Assessment (DSA) and Probabilistic Safety Assessment (PSA). The present paper deals with an overview of BEPU features and applications including constitutive elements and of sample applications.

Keywords: best estimate; plus uncertainty; bepu; uncertainty bepu; thermal hydraulics; estimate plus

Journal Title: Nuclear Engineering and Design
Year Published: 2019

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.