Abstract Open pit mine planning and determination of mining orientation are a critically important part of a mine opening to its closure. However, an optimal extraction sequences (OES) is identified… Click to show full abstract
Abstract Open pit mine planning and determination of mining orientation are a critically important part of a mine opening to its closure. However, an optimal extraction sequences (OES) is identified when an NPV cumulative trend becomes steady. This is controlled manually, typically from a nested pit shell methodology based on the experience which can lead to suboptimal results. Given this problem, a mathematical method to provide an analytical practice, which intends to prevent manual identification of an OES seems to be inevitable. The aim of this study is to propose Present Value-Volume (PV-V) and NPV-Cumulative Total Ore (NPV-CTO) fractal models to identify an accurate excavation orientation as well as an OES with respect to economic principals and ore grades. This has been conducted to achieve an earlier pay-back period and highest cumulative NPV in Kahang Cu-Mo porphyry deposit, central Iran. Results derived via the PV-V fractal modelling indicate an accurate mining orientation with an N-S trend. Thus, pit sequence No. 92 was selected as the closure of the open pit mining for the Kahang deposit. Consequently, the NPV-CTO fractal model provides an analytical tool which can be used for determination of an OES for an open pit mine.
               
Click one of the above tabs to view related content.