LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Hierarchical Integration of Planning and Scheduling for Industrial Waste Incineration

Photo from wikipedia

This works aims to demonstrate that hierarchical integration of planning and scheduling of industrial waste incineration improves the energy efficiency of the process, compared to available scheduling approaches. Through the… Click to show full abstract

This works aims to demonstrate that hierarchical integration of planning and scheduling of industrial waste incineration improves the energy efficiency of the process, compared to available scheduling approaches. Through the integration with planning models, scheduling models can rely on more far-sighted information; therefore, energy deficits and excesses can be better compensated in the long run. Subsequently, the auxiliary fuel consumption of the incineration process can be further reduced, which leads to an overall increase of the energy efficiency. Planning and scheduling models are formulated as mixed-integer linear programming (MILP) problems with discrete time representation, based on single, uniform grids. The considered waste incineration system consists of storage tanks, a complex piping network, tank wagons for waste transport, unloading stations, and firing lances of incineration units. The conducted industrial case studies reveal substantial improvement potential of daily empirically based w...

Keywords: incineration; waste incineration; integration planning; planning scheduling

Journal Title: Industrial & Engineering Chemistry Research
Year Published: 2017

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.