Correspondence Ahmad Sadeghi Yazdankhah, Department of Electrical Engineering, Sahand University of Technology, Tabriz, Iran. Email: [email protected] Abstract The combined heat and power (CHP) plant is one of the emerging technologies… Click to show full abstract
Correspondence Ahmad Sadeghi Yazdankhah, Department of Electrical Engineering, Sahand University of Technology, Tabriz, Iran. Email: [email protected] Abstract The combined heat and power (CHP) plant is one of the emerging technologies of gas-fired units, which plays an important role in reducing environmental pollutants and delivering high energy efficiency. Moreover, the hydrogen energy storage (HES) system with extra power storage from wind turbine via power to hydrogen technology allows the injection of stored energy into the power grid by reverse hydrogen to power services, offsetting in this way the uncertainty of wind power. Consequently, simultaneous usage of CHP and HES units not only makes the maximum use of wind power distribution but also increases flexibility and reduces the operating costs of the entire network. Therefore, this paper proposes an interval optimization technique for managing the uncertainty of wind power generation in the integrated electricity and natural gas (NG) networks considering CHP–HES. Moreover, to enhance the flexibility of the NG network, a linearized Taylor series-based model is proposed for modelling linepack of gas pipelines in the proposed scheduling framework that is formulated mixed-integer linear programming and solved using the Cplex solver. The obtained results indicate that the simultaneous use of CHP–HES in the day-ahead scheduling reduces the operating cost and increases the flexibility of the whole network.
               
Click one of the above tabs to view related content.