ABSTRACT This paper investigates the accuracy of the wind resource estimation for a site in a central India region using a latest licensed version of WAsP 11 and windPRO 3.1.… Click to show full abstract
ABSTRACT This paper investigates the accuracy of the wind resource estimation for a site in a central India region using a latest licensed version of WAsP 11 and windPRO 3.1. Whole one year measured met mast wind data has been taken using anemometer and wind vane at 10 m and 25 m height, respectively above ground level. The digitized elevation and roughness model of the corresponding site shows the roughness class 4 (roughness length 1.2525 m). The wind data has been extrapolated up to 80 m height by using power and log law models which provide the power density near about 120 W/m2. As per the micro sitting guidelines for the virtual wind farm installation 5D X 7D mapping has been selected which Indicates the total power output by installing 8 Vestas V-90 1.8 MW wind turbine from WAsP is 31.561 GWh and from windPRO is 28.083 GWh.
               
Click one of the above tabs to view related content.