At times, various analytical and empirical approaches used to estimate the initial sizing of a desilting basin in a hydropower project would give very different results and the designer has… Click to show full abstract
At times, various analytical and empirical approaches used to estimate the initial sizing of a desilting basin in a hydropower project would give very different results and the designer has to take a call judiciously. The purpose of this study is to develop a monograph based on Teaching–Learning-Based Optimization and Gravitational Search algorithm for a practical range of depth of desilting basins. The parameters commonly used in hydropower projects for estimation of desilting basins sizing and its efficiency are used in this study. The outcome is further verified using a list of mega hydropower projects. This study will be useful in fixing the best optimized dimension of desilting basins.
               
Click one of the above tabs to view related content.