LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Comparison of Cold Powering Performance of 2-m-Long Nb3Sn 11 T Model Magnets

Photo from academic.microsoft.com

For the upgrade of the LHC, two 15-m NbTi main dipole magnets are foreseen to be replaced by two 11 T 5.7-m-long Nb 3Sn dipoles each. A series of model… Click to show full abstract

For the upgrade of the LHC, two 15-m NbTi main dipole magnets are foreseen to be replaced by two 11 T 5.7-m-long Nb 3Sn dipoles each. A series of model magnets has been produced to verify the design choices that are important for the prototype and series production, focusing on mechanical aspects and protection studies. A fourth and a fifth 2-m single aperture models were produced, assembled, and tested. In this paper, the cold powering tests of the single aperture models SP104 and SP105 will be presented and the results will be compared with the previous models. Special attention will be given to the upper limit in magnet current due to quenches in the midplane turns.

Keywords: powering performance; cold powering; performance long; model magnets; comparison cold

Journal Title: IEEE Transactions on Applied Superconductivity
Year Published: 2018

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.