LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Techno-Economic Study on Implementation of Inventory Control Requirements for a Nuclear-Powered Closed-Cycle Gas Turbine Power Plant

Photo from wikipedia

The use of an inventory control system offers a unique benefit of stable cycle thermal efficiency during part-load operation. This article focuses on the influence of initial inventory tank pressure… Click to show full abstract

The use of an inventory control system offers a unique benefit of stable cycle thermal efficiency during part-load operation. This article focuses on the influence of initial inventory tank pressure on the control level using pressure differential as a driving force of the inventory control system. The study also considered the effects of using multiple tanks to increase the overall size of the inventory control tank and the use of insulation to reduce the impact of temperature variation between the compressor discharge temperature and the inventory tank temperature. The second part of this analysis is a cost comparison between the use of multiple tanks and the use of a transfer compressor to achieve high cycle efficiency at continuous part-load operation. The discussions in this paper accentuate the optimum benefit for utilizing an inventory control system for a single-shaft intercooled-recuperated closed-cycle gas turbine plant.

Keywords: cycle gas; control; inventory control; closed cycle; inventory

Journal Title: Journal of Nuclear Engineering and Radiation Science
Year Published: 2020

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.