LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

A Novel Intelligent Method for Predicting the Penetration Rate of the Tunnel Boring Machine in Rocks

Photo by cokdewisnu from unsplash

In the construction of rock tunnels, the penetration rate of the tunnel boring machine (TBM) is influenced by many factors (e.g., geomechanical parameters), some of which are highly uncertain. It… Click to show full abstract

In the construction of rock tunnels, the penetration rate of the tunnel boring machine (TBM) is influenced by many factors (e.g., geomechanical parameters), some of which are highly uncertain. It is difficult to establish a precise model for predicting the penetration rate on the basis of the influencing factors. Thus, this work proposed a useful method, based on the relevance vector machine (RVM) and particle swarm optimization (PSO), for the prediction of the TBM penetration rate. In this method, the RVM played a vital role in establishing a nonlinear mapping relationship between the penetration rate and its influencing factors through training-related samples. Then, the penetration rate could be predicted using some collected data of the influencing factors. As for the PSO, it helped to find the optimum value of a key parameter (called the basis function width) that was needed in the RVM model. Subsequently, the validity of the proposed RVM-PSO method was checked with the data monitored from a rock tunnel. The results showed that the RVM-PSO method could estimate the penetration rate of the TBM, and it proved superior to the back-propagation artificial neural network, the least-squares support vector machine, and the conventional RVM methods, in terms of the prediction performance. Moreover, the proposed RVM-PSO method could be applied to identify the difference in the importance of the various factors affecting the TBM penetration rate prediction for a tunnel.

Keywords: machine; penetration; tunnel; method; penetration rate

Journal Title: Mathematical Problems in Engineering
Year Published: 2020

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.