This study considers a two-machine flowshop with a limited waiting time constraint between the two machines and sequence-dependent setup times on the second machine. These characteristics are motivated from semiconductor… Click to show full abstract
This study considers a two-machine flowshop with a limited waiting time constraint between the two machines and sequence-dependent setup times on the second machine. These characteristics are motivated from semiconductor manufacturing systems. The objective of this scheduling problem is to minimize the total tardiness. In this study, a mixed-integer linear programming formulation was provided to define the problem mathematically and used to find optimal solutions using a mathematical programming solver, CPLEX. As CPLEX required a significantly long computation time because this problem is known to be NP-complete, a genetic algorithm was proposed to solve the problem within a short computation time. Computational experiments were performed to evaluate the performance of the proposed algorithm and the suggested GA outperformed the other heuristics considered in the study.
               
Click one of the above tabs to view related content.