Industry is an important pillar of the national economy, and industrial projects are the most complex and difficult to manage and control in the construction industry; thus, the resource scheduling… Click to show full abstract
Industry is an important pillar of the national economy, and industrial projects are the most complex and difficult to manage and control in the construction industry; thus, the resource scheduling control of industrial projects is one of the core issues for industrial construction projects. The performance rate of the contract time periods of previous industrial construction projects has been very low. In scheduling control based on case-based reasoning (CBR), the goal is to implement preventive measures by referring to existing scheduling control cases and control the scheduling of resources through reasoning on emergency measures to prevent scheduling control deviations. In this paper, the rough set approach is used to represent the case feature information in a case reasoning model for industrial project scheduling control, attribute reduction is used to determine the weights of the feature attributes in the rough set representation, and the similarity between cases is calculated for case retrieval. The accuracy of the rough-set-based similarity calculation is verified through matrix similarity calculations and a visual analysis of the all closeness centrality and weighted all degree centrality of the corresponding complex network; thus, similar cases of industrial project scheduling control are identified. To verify the applicability and effectiveness of the proposed methodology, a typical coal chemical general contract project case is carried out. The rough set comprehensive similarity results were 0.733, 0.621, 0.536, 0.614, 0.559, 0.950, 0.708, 0.546, 0.733, 0.664, 0.526, and 0.743, and the matrix similarity results were 0.417, 0.583, 0.417, 0.417, 0.417, 0.833, 0.417, 0.500, 0.417, 0.500, 0.333, and 0.500. The results showed that the case retrieval accuracy of traditional matrix similarity is not as high as the rough set comprehensive similarity, so X 6 is the most similar case to the target case Y. Case retrieval results indicate that the proposed methodology can provide a good similar case selection strategy with project managers, and the final required preventive measures for the target case can be found. Based on the identified similar cases, preventive measures for scheduling control are formulated to effectively prevent scheduling deviations of industrial projects.
               
Click one of the above tabs to view related content.