Bolted joint railroad is the subject matter of this paper. Rail joint elements are subjected to cyclic and impact loads as a result of the passage of trains, which causes… Click to show full abstract
Bolted joint railroad is the subject matter of this paper. Rail joint elements are subjected to cyclic and impact loads as a result of the passage of trains, which causes the origination and growth of fatigue cracks occurring, in most cases, around the bolt holes. Fatigue failure around rail-end-bolt holes is particularly dangerous because it leads to derailment of trains and, consequently, to inevitable accidents. Moreover, the cracking at rail-ends, which starts from bolt hole surface, causes premature rails replacement. The presence of residual compressive hoop stresses around the bolted holes, which is achieved by prestressing of these holes, extends the fatigue life of bolted joint railroads. This article presents an innovative technology for pre-stressing of rail-end-bolt holes, implemented on a vertical machining centre of Revolver vertical (RV) type. Two consecutive operations are involved in the manufacturing technology process: formation of the hole by drilling, reaming and making of a chamfer through a new combined cutting tool; cold hole working by spherical motion cold working through a new tool equipment, which minimizes the axial force on the reverse stroke. The new technology introduces beneficial residual compressive stresses around the bolted holes thereby preventing the fatigue cracks growth and increasing the fatigue life of these openings.
               
Click one of the above tabs to view related content.