“The times they are a-changin’”: A longitudinal, mixed methods case study of a hospital transformation

Photo from wikipedia

Background Changes to hospital infrastructure are inevitable in ever-evolving healthcare systems. The redevelopment of hospitals and opening of new buildings can be a complex and challenging time for staff as… Click to show full abstract

Background Changes to hospital infrastructure are inevitable in ever-evolving healthcare systems. The redevelopment of hospitals and opening of new buildings can be a complex and challenging time for staff as they must find ways to deliver safe and high-quality care while navigating the complexities and uncertainties of change. This study explores the perspectives and experiences of staff and patients before and after the opening of a new hospital building as part of a large public hospital redevelopment in Sydney, Australia. Methods The study comprised a longitudinal mixed methods case study design. Methods included two rounds of staff surveys (n = 292 participants), two rounds of staff interviews (n = 66), six rounds of patient surveys (n = 255), and analysis of hospital data at tri-monthly intervals over two years. Data were compared before (2019) and after (2020) a new hospital building opened at a publicly funded hospital in Sydney, Australia. Results Four key themes and perspectives emerged from the interviews including change uncertainty, communication effectiveness, staffing adequacy and staff resilience. Significant differences in staff perceptions of change readiness over time was identified. Specifically, perceptions that the organisational change was appropriate significantly decreased (2019: 15.93 ± 3.86; 2020: 14.13 ± 3.62; p < .001) and perceptions that staff could deal with the change significantly increased (2019: 17.30 ± 4.77; 2020: 19.16 ± 4.36; p = .001) after the building opened compared to before. Global satisfaction scores from patient survey data showed that patient experience significantly declined after the building opened compared to before (2020: 81.70 ± 21.52; 2019: 84.43 ± 18.46)), t(254) = -64.55, p < 0.05, and improved a few months after opening of the new facilities. This coincided with the improvement in staff perceptions in dealing with the change. Conclusions Moving into a new hospital building can be a challenging time for staff and patients. Staff experienced uncertainty and stress, and displayed practices of resilience to deliver patient care during a difficult period of change. Policy makers, hospital managers, staff and patients must work together to minimise disruption to patient care and experience. Key recommendations for future hospital redevelopment projects outline the importance of supporting and informing staff and patients during the opening of a new hospital building.

Keywords: staff patients; new hospital; opening new; staff; building; hospital

Journal Title: PLOS ONE
Year Published: 2022

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.