Reactor configuration, control strategy and inoculation method were key factors affecting the rapid start-up of partial nitrification/anammox (PN/A) process and the efficient enrichment of functional bacteria (anammox and ammonia oxidizing… Click to show full abstract
Reactor configuration, control strategy and inoculation method were key factors affecting the rapid start-up of partial nitrification/anammox (PN/A) process and the efficient enrichment of functional bacteria (anammox and ammonia oxidizing bacteria). At present, PN/A process was generally operated through single factor rather than forming a system. In this study, a novel aerobic-biofilm/anaerobic-granular nitrogen removal system (OANRS) was constructed, which consisted of a multi-stage aerobic-biofilm/anaerobic-granular baffle reactor (MOABR) and a control strategy on pH/aeration time. PN process was started within 10d, and PN/A process was started on the basis of stable PN process within 41d. The simultaneous enrichment of functional bacteria was achieved by combining the advantages of single-stage and two-stage PN/A process. The results of high-throughput sequencing showed that Candidatus Kuenenia (20.42±15.88%) was highly enriched in each compartment at day 98, and the relative abundance of Candidatus Kuenenia in the anaerobic compartment R4 was as high as 43.13%.
               
Click one of the above tabs to view related content.