LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Evaluation of construction impacts and optimization of control measures for large-section metro tunnels overpassing existing tunnels

The development of urban rail transit has led to an increase in the number of large section subway tunnels crossing existing tunnels. This study combines the actual engineering of the… Click to show full abstract

The development of urban rail transit has led to an increase in the number of large section subway tunnels crossing existing tunnels. This study combines the actual engineering of the Yanggongqiao Station Longzhuayan Station section tunnel of Chengdu Metro Line 17 Phase II project crossing the existing Line 7 shield tunnel, and uses on-site investigation, monitoring, and numerical simulation methods to evaluate the construction impact. Based on this, measures such as bench pile reinforcement, pre grouting, and parameter optimization are proposed. In practical applications, the comparison between monitoring and simulation results shows that these measures effectively control the deformation of existing tunnels, providing important references for similar projects.

Keywords: section; existing tunnels; evaluation construction; large section; optimization

Journal Title: Thermal Science
Year Published: 2025

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.