The reasonable scheduling of agricultural machinery can avoid their purposeless flow during the operational service and reduce the scheduling cost of agricultural machinery service centers. In this research, a multiregional… Click to show full abstract
The reasonable scheduling of agricultural machinery can avoid their purposeless flow during the operational service and reduce the scheduling cost of agricultural machinery service centers. In this research, a multiregional agricultural machinery scheduling model with a time window was established considering the timeliness of agricultural machinery operation. This model was divided into two stages: In the first stage, regions were divided through the Voronoi diagram, and farmlands were distributed to intraregional service centers. In the second stage, the model was solved using the hybrid particle swarm optimization (HPSO). The algorithm improves the performance of the algorithm by introducing a crossover, mutation, and particle elimination mechanism, and by using a linear differential to reduce the inertia weight and trigonometric function learning factor. Next, the accuracy and effectiveness of the algorithm are verified by different experimental samples. The results show that the algorithm can effectively reduce the scheduling cost, and has the advantages of strong global optimization ability, high stability, and fast convergence speed. Subsequent algorithm comparison proves that HPSO has better performance in different situations, can effectively solve the scheduling problem, and provides a reasonable scheduling scheme for multiarea and multifarmland operations.
               
Click one of the above tabs to view related content.