In this study, we predicted the structural behavior of a track-bridge and a bridge based on the expected increases in future train speeds by modeling the Yeongjong Bridge (a part… Click to show full abstract
In this study, we predicted the structural behavior of a track-bridge and a bridge based on the expected increases in future train speeds by modeling the Yeongjong Bridge (a part of the Incheon International Airport Expressway in Korea). To verify the train’s safe operation, we performed a three-dimensional (3D) numerical analysis using full-scale bridge modeling. The rail-girder interaction force generated at one end of the direct fixation track of Yeongjong Bridge during train operations was evaluated by taking field measurements of the vertical displacements of the rail and girder at the center and end of a track girder. We further compared our predictions with various field measurements to evaluate the dynamic behavior of the entire Yeongjong Bridge.
               
Click one of the above tabs to view related content.