Three-bench seven-step excavation method (TSEM) has been widely used in large-section loess tunnels for high-speed railway in China. As the most commonly applied pre-supports, pipe roofs and leading ductules are… Click to show full abstract
Three-bench seven-step excavation method (TSEM) has been widely used in large-section loess tunnels for high-speed railway in China. As the most commonly applied pre-supports, pipe roofs and leading ductules are broadly used in the ground reinforcement of loess tunnels. Their application is to ensure face stability and prevent tunnel collapse during construction. This study focused on the impacts of the TSEM on the ground surface settlement (GSS), as well as the tunnel displacement characteristics for the high-speed railway tunnels with large cross-sections in loess ground. Furthermore, the reinforcement effects of the two kinds of pre-supports were compared in this study. In-situ tests for a total of 12 sections were conducted to reveal the GSSs and displacement characteristics for the shallow-buried large-section loess tunnels. The monitoring results showed that the excavation process plays a significant role on the GSSs and tunnel displacements. A maximum value was observed for the tunnel displacement rate at the excavation of the upper and middle benches, where the face instability or collapse were prone to occur. The GSS trough curves were deviated to the early excavation side, with no conformation to the Gauss distribution. After a series of comparisons, we concluded that the pre-reinforcement effect of the pipe roof is better than that of the leading ductule for the loess tunnels.
               
Click one of the above tabs to view related content.