LAUSR.org creates dashboard-style pages of related content for over 1.5 million academic articles. Sign Up to like articles & get recommendations!

Research on Energy Storage Optimization Operation Schedule in an Island System

Photo from wikipedia

This paper proposes a 24-h ahead unit commitment for a diesel-photovoltaic (PV)-battery system using mixed-integer linear programming (MILP) to minimize the operating cost which includes the power storage system (PSS)… Click to show full abstract

This paper proposes a 24-h ahead unit commitment for a diesel-photovoltaic (PV)-battery system using mixed-integer linear programming (MILP) to minimize the operating cost which includes the power storage system (PSS) in the reserve capacity. Considering the Kinmen island’s winter peak load case of 20 MW, and summer peak load case of 60 MW, a 24-h schedule for the diesel-PV-battery system island system for these two scenarios was optimized that allows the PSS to perform both as an additional reserve capacity and peak-shaving auxiliary device. The results show that the addition of PSS in the dispatch decision can allow the flexibility of the systems, especially in the reserve allocation, to up to twice the value of the PSS capacity. In this way, the PSS reduces the early startup and late shutdown of high-cost units while maintaining the system reserve, thereby, reducing the operating cost of the system.

Keywords: system; schedule; island system; storage; research energy

Journal Title: Applied Sciences
Year Published: 2021

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.