To effectively utilize coal gangue (CG) with low Al/Si ratio, the thermal activation method was used. The activated CG, as supplementary cementitious materials (SCMs), was added into ordinary Portland cement… Click to show full abstract
To effectively utilize coal gangue (CG) with low Al/Si ratio, the thermal activation method was used. The activated CG, as supplementary cementitious materials (SCMs), was added into ordinary Portland cement (OPC) to study its physical properties. The XRD results show that CG undergoes a phase transition from kaolinite to metakaolinite during activation. The NMR tests reveal that the low polymerization state Q3 is continuously broadened, and the Al coordination gradually changes from Al VI to Al V and Al IV. The CG particles are scale-like and glassy with a loose structure. By mixing the activated CG (under 800 °C) with cement (mass ratio = 3:7), the water demand of normal consistency increases by 7.2% and the initial and final setting times extend by 67 min and 81 min, respectively. The rough surface and loose structure of activated CG are the main factors contributing to the higher water demand of normal consistency. The micro-aggregate effect of the activated CG reduces the contact rate between the cement particles and water, and the interparticles, thus slowing down the process of hydration reaction, and leading to longer setting times.
               
Click one of the above tabs to view related content.