The frame construction of an apartment complex that consists of multiple buildings encounters various uncertainties, owing to the complex relationships between units of work. Currently, the period of such a… Click to show full abstract
The frame construction of an apartment complex that consists of multiple buildings encounters various uncertainties, owing to the complex relationships between units of work. Currently, the period of such a construction is calculated based on the number of floors of the highest building in the complex. This study quantitatively analyzes an apartment frame construction period using a queue model and evaluates the validity of the estimated period. In this regard, a methodology is proposed for analyzing the construction period by applying the concept of a customer and a server. A case study on the duration of an apartment frame construction period is conducted with the Korea Land and Housing Corporation, which has supplied the largest number of apartments in South Korea. It was found that the stable state of a queue system was observed when the rate of server utilization was applied to the basement and above-ground floors. However, a stable state was not reached on the ground floor. This study includes non-working days in its calculation and quantitatively analyzes uncertainty factors during construction. Therefore, the findings can be practically utilized to quantitatively plan the durations of work units in an apartment frame construction.
               
Click one of the above tabs to view related content.