A Novel Shuffled Frog-Leaping Algorithm for Unrelated Parallel Machine Scheduling with Deteriorating Maintenance and Setup Time

Photo by cokdewisnu from unsplash

Unrelated parallel machine scheduling problems (UPMSP) with various processing constraints have been considered fully; however, a UPMSP with deteriorating preventive maintenance (PM) and sequence-dependent setup time (SDST) is seldom considered.… Click to show full abstract

Unrelated parallel machine scheduling problems (UPMSP) with various processing constraints have been considered fully; however, a UPMSP with deteriorating preventive maintenance (PM) and sequence-dependent setup time (SDST) is seldom considered. In this study, a new differentiated shuffled frog-leaping algorithm (DSFLA) is presented to solve the problem with makespan minimization. The whole search procedure consists of two phases. In the second phase, quality evaluation is done on each memeplex, then the differentiated search processes are implemented between good memeplexes and other ones, and a new population shuffling is proposed. We conducted a number of experiments. The computational results show that the main strategies of DSFLA were effective and reasonable and DSFLA was very competitive at solving UPMSP with deteriorating PM and SDST.

Keywords: parallel machine; machine scheduling; unrelated parallel; frog leaping; setup time; shuffled frog

Journal Title: Symmetry
Year Published: 2021

Link to full text (if available)


Share on Social Media:                               Sign Up to like & get
recommendations!

Related content

More Information              News              Social Media              Video              Recommended



                Click one of the above tabs to view related content.