Sign Up to like & get
recommendations!
0
Published in 2019 at "Journal of Rock Mechanics and Geotechnical Engineering"
DOI: 10.1016/j.jrmge.2019.01.002
Abstract: Abstract This study aims to develop several optimization techniques for predicting advance rate of tunnel boring machine (TBM) in different weathered zones of granite. For this purpose, extensive field and laboratory studies have been conducted…
read more here.
Keywords:
several optimization;
optimization;
optimization techniques;
advance rate ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2020 at "Tunnelling and Underground Space Technology"
DOI: 10.1016/j.tust.2019.103219
Abstract: Abstract A realistic assessment of the time and cost to complete a tunnel using tunnel boring machine (TBM) is directly related to the ability to accurately predict machine advance rate. Advance rate depends on various…
read more here.
Keywords:
advance;
hard rock;
advance rates;
rate ... See more keywords