Sign Up to like & get
recommendations!
1
Published in 2017 at "IEEE Transactions on Applied Superconductivity"
DOI: 10.1109/tasc.2016.2633421
Abstract: For the upgrade of the LHC during the long shutdown 2 and for the HL-LHC upgrade during the long shutdown 3, a few 15 m 8.3 T Nb–Ti main dipole magnets are foreseen to be…
read more here.
Keywords:
aperture;
cold powering;
twin aperture;
aperture model ... See more keywords