Sign Up to like & get
recommendations!
1
Published in 2019 at "International journal of systematic and evolutionary microbiology"
DOI: 10.1099/ijsem.0.003714
Abstract: Two Gram-stain-positive, motile, endospore-forming, aerobic strains, designated V44-8T and V47-23aT, were isolated from environmental air sampling at the vehicle assembly building at Cape Canaveral, Florida, where the Viking spacecraft were assembled. Growth was observed at…
read more here.
Keywords:
v47 23at;
viking spacecraft;
assembly building;
strain ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2024 at "Buildings"
DOI: 10.3390/buildings14040918
Abstract: Owing to its rapid advancement, information technology has emerged as a critical tool in assembly construction for addressing market demands, improving project quality, and reducing costs. However, the absence of unified informatization standards within the…
read more here.
Keywords:
methodology;
assembly building;
maturity;
maturity informatization ... See more keywords