Articles with "brt" as a keyword



Photo from archive.org

A methodological comparison of head-cut based gully erosion susceptibility models: Combined use of statistical and artificial intelligence

Sign Up to like & get
recommendations!
Published in 2020 at "Geomorphology"

DOI: 10.1016/j.geomorph.2020.107136

Abstract: Abstract A GIS-based hybrid approach for gully erosion susceptibility mapping (GESM) in the Biarjamand watershed in Iran is presented. A database comprised of 15 geo-environmental factors (GEFs) was compiled and used to predict the spatial… read more here.

Keywords: susceptibility; binary logistic; methodological comparison; erosion susceptibility ... See more keywords
Photo from wikipedia

Bus rapid transit systems as a governance reform project

Sign Up to like & get
recommendations!
Published in 2018 at "Journal of Transport Geography"

DOI: 10.1016/j.jtrangeo.2018.06.005

Abstract: Bus Rapid Transit systems exist in over 206 cities and 45 countries around the world. They are seen to provide a much lower cost option of mass mobility than fixed rail or underground systems which… read more here.

Keywords: bus rapid; transit; transport; governance ... See more keywords
Photo from wikipedia

Investigating users' travel behaviours and perceptions of single-corridor BRT: Lessons from Lahore

Sign Up to like & get
recommendations!
Published in 2021 at "Journal of Transport Geography"

DOI: 10.1016/j.jtrangeo.2020.102942

Abstract: Abstract Despite the global popularity of bus rapid transit (BRT) in last couple of decades, there is limited empirical evidence in the rapidly urbanizing developing countries regarding corridor-wide users' typical travel characteristics and perceptions of… read more here.

Keywords: investigating users; travel characteristics; brt users; corridor ... See more keywords
Photo from wikipedia

How does an open system bus rapid transit (BRT) facilitate inter and intra-modal mobility? A visual analytic analysis of Brisbane, Australia

Sign Up to like & get
recommendations!
Published in 2020 at "Research in Transportation Economics"

DOI: 10.1016/j.retrec.2020.100906

Abstract: This paper explores the multimodal mobility impact of implementing BRT as an open system with mixed services and transfers or as a closed system with separate BRT services. In large multimodal public transport networks, interchanges… read more here.

Keywords: brisbane; system; mobility; analysis ... See more keywords
Photo from wikipedia

Bus rapid transit arrives in Barranquilla, Colombia: Understanding a changing landscape through residents' travel experiences

Sign Up to like & get
recommendations!
Published in 2020 at "Travel behaviour and society"

DOI: 10.1016/j.tbs.2020.06.003

Abstract: Abstract In this article, we describe how the travel experiences of residents of Barranquilla, Colombia have changed since a new bus rapid transit system was deployed in 2010 along with changes to pre-existing private transit… read more here.

Keywords: barranquilla colombia; travel experiences; bus rapid; transit ... See more keywords
Photo by cokdewisnu from unsplash

Understanding captive user behavior in the competition between BRT and motorcycle taxis

Sign Up to like & get
recommendations!
Published in 2018 at "Transport Policy"

DOI: 10.1016/j.tranpol.2017.10.003

Abstract: Abstract Transit-dependent users, far from being captives, may have other transportation alternatives. In some developing countries, depending on the characteristics of the city, instead of cycling or walking, captive users opt for informal services to… read more here.

Keywords: user behavior; understanding captive; motorcycle taxis; captive user ... See more keywords
Photo from wikipedia

Exploring the effects of passive transit signal priority design on bus rapid transit operation: a microsimulation-based optimization approach

Sign Up to like & get
recommendations!
Published in 2020 at "Transportation Letters"

DOI: 10.1080/19427867.2020.1805681

Abstract: ABSTRACT The Bus Rapid Transit (BRT) system can be a cost-effective alternative to foster public transportation. However, the delay in signalized intersections is critical to the stable progression of BRT operation. Transit Signal Priority (TSP)… read more here.

Keywords: rapid transit; transit signal; signal priority; bus rapid ... See more keywords
Photo by tylercaseyprod from unsplash

Determinants of adenine-mutagenesis in diversity-generating retroelements

Sign Up to like & get
recommendations!
Published in 2020 at "Nucleic Acids Research"

DOI: 10.1093/nar/gkaa1240

Abstract: Abstract Diversity-generating retroelements (DGRs) vary protein sequences to the greatest extent known in the natural world. These elements are encoded by constituents of the human microbiome and the microbial ‘dark matter’. Variation occurs through adenine-mutagenesis,… read more here.

Keywords: mutagenesis; generating retroelements; adenine mutagenesis; diversity generating ... See more keywords
Photo from wikipedia

Conditional Transit Signal Priority Optimization at Stop-to-Stop Segments to Improve BRT On-Time Performance

Sign Up to like & get
recommendations!
Published in 2022 at "IEEE Access"

DOI: 10.1109/access.2022.3161464

Abstract: Bus rapid transit (BRT) as a valid means of public transportation for overpopulated country of China is an especial mode of travel to relieve traffic congestion. Despite utilizing exclusive bus line, BRT constantly experiences delay… read more here.

Keywords: transit; time performance; tsp; brt ... See more keywords
Photo from wikipedia

Democracy, Legitimacy, and Mega‐Project Politics: The Evolution of Lahore’s First BRT Corridor

Sign Up to like & get
recommendations!
Published in 2022 at "Antipode"

DOI: 10.1111/anti.12829

Abstract: This thesis asks how opportunities emerge for states in the Global South to undertake large-scale spending on public transport, particularly in cases where they have previously withdrawn from its provision. In recent years, such opportunities… read more here.

Keywords: brt corridor; public transport; lahore first; brt ... See more keywords
Photo from wikipedia

Challenges of Bus Rapid Transit (BRT) Project in Dhaka and Possible Overcomes

Sign Up to like & get
recommendations!
Published in 2018 at "International journal of engineering research and technology"

DOI: 10.17577/ijertv7is070144

Abstract: Dhaka is one of the largest mega cities in the world. It is the center of all administrative, business, commercial and cultural activities of Bangladesh. The rapid and unplanned developments over the past decades have… read more here.

Keywords: bus rapid; transit brt; brt; rapid transit ... See more keywords