Sign Up to like & get
recommendations!
1
Published in 2023 at "Archives of Foundry Engineering"
DOI: 10.24425/afe.2020.131281
Abstract: The paper presents a production scheduling problem in a foundry equipped with two furnaces and one casting line, where the line is a bottleneck and furnaces, of the same capacity, work in parallel. The amount…
read more here.
Keywords:
problem;
two furnaces;
casting line;
production scheduling ... See more keywords