Sign Up to like & get
recommendations!
1
Published in 2018 at "Atomic Energy"
DOI: 10.1007/s10512-018-0382-9
Abstract: A gas-purification system with maximum capacity 50 m3/h was developed, fabricated, and tested to catch nitrogen oxides released during hydrometallurgical processing of spent fuel from the BREST reactor. To catch nitrogen oxides, the setup employs…
read more here.
Keywords:
nitrogen;
testing integrated;
gas;
nitrogen oxide ... See more keywords