Sign Up to like & get
recommendations!
1
Published in 2022 at "Journal of Applied Clinical Medical Physics"
DOI: 10.1002/acm2.13607
Abstract: Abstract This study reports the beam commissioning results for the first clinical RefleXion Linac. Methods: The X1 produces a 6 MV photon beam and the maximum clinical field size is 40 × 2 cm2 at…
read more here.
Keywords:
system;
beam commissioning;
first clinical;
beam ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2017 at "Fusion Engineering and Design"
DOI: 10.1016/j.fusengdes.2017.05.050
Abstract: The JET ICRF ITER-like Antenna (ILA) has been operated at 33,42 and 47 MHz in 2008-2009 but stopped operation in 2009 due to the failure of one of the tuning capacitors inside the antenna. Tests…
read more here.
Keywords:
results reinstated;
first results;
jet;
jet icrf ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2019 at "Journal of Instrumentation"
DOI: 10.1088/1748-0221/14/06/p06010
Abstract: The Neutrinos Angra Experiment has completed a major step by finishing the comissioning of the detector and the data acquisition system at the experimental site located in the Angra dos Reis nuclear power plant. The…
read more here.
Keywords:
neutrinos angra;
angra experiment;
detector;
commissioning first ... See more keywords