Sign Up to like & get
recommendations!
1
Published in 2021 at "Engineering Failure Analysis"
DOI: 10.1016/j.engfailanal.2020.105135
Abstract: Abstract Gallery cracking often occurs during the construction and operation periods of dams. It is very important to implement cracking control measures through the whole dam design, construction, and management process. In this study, a…
read more here.
Keywords:
construction;
dam;
cracking control;
study ... See more keywords