Articles with "enlarge large" as a keyword



Photo from wikipedia

Challenges and countermeasures for using pile-beam-arch approach to enlarge large-diameter shield tunnel to subway station

Sign Up to like & get
recommendations!
Published in 2020 at "Tunnelling and Underground Space Technology"

DOI: 10.1016/j.tust.2020.103326

Abstract: Abstract The Jiangtai station (on Line 14 of the Beijing Subway) is the first station in China constructed by using the pile-beam-arch (PBA) method to enlarge a large-diameter shield tunnel. This study illustrates the construction… read more here.

Keywords: station; construction; pile beam; using pile ... See more keywords