Sign Up to like & get
recommendations!
0
Published in 2017 at "Wind Engineering"
DOI: 10.1177/0309524x17721998
Abstract: In order to provide the reactive power demand of a self-excited induction generator which is required to achieve a voltage build-up, a three-phase capacitor bank is connected between the generator terminals. As loading increases, the…
read more here.
Keywords:
voltage;
induction generator;
excited induction;
generator ... See more keywords