Photo from wikipedia
Sign Up to like & get
recommendations!
1
Published in 2018 at "Journal of the Brazilian Society of Mechanical Sciences and Engineering"
DOI: 10.1007/s40430-018-0980-4
Abstract: We investigate a new variant of the hybrid flow shop problem (HFSP) considering machine blocking and both sequence-independent and sequence-dependent setup times. Since the HFSP is NP-hard, we propose heuristic algorithms along with priority rules…
read more here.
Keywords:
setup times;
hybrid flow;
heuristic algorithms;
machine blocking ... See more keywords
Photo from wikipedia
Sign Up to like & get
recommendations!
1
Published in 2019 at "Journal of Energy Storage"
DOI: 10.1016/j.est.2019.100883
Abstract: Abstract Redox flow batteries attract ever growing interest over the past decades in stationary energy storage. Iron and zinc species have been widely studied as active species for redox flow batteries. In this paper, the…
read more here.
Keywords:
flow battery;
supporting electrolytes;
aqueous hybrid;
hybrid flow ... See more keywords
Photo from wikipedia
Sign Up to like & get
recommendations!
0
Published in 2017 at "Journal of Manufacturing Systems"
DOI: 10.1016/j.jmsy.2017.04.018
Abstract: Abstract This paper deals with N-stage hybrid flow shop (HFS) lot streaming problem to develop a schedule that minimises the makespan. The HFS considered consists of one machine in each of the first (N-1) stages…
read more here.
Keywords:
hybrid flow;
lot streaming;
flow shop;
time ... See more keywords
Photo from wikipedia
Sign Up to like & get
recommendations!
0
Published in 2020 at "Journal of Power Sources"
DOI: 10.1016/j.jpowsour.2020.227788
Abstract: Abstract To develop efficient electrochemical energy storage systems for large-scale use of renewable energy, a novel quinoxaline-bearing redox-active conjugated polymer (poly(6-(1H-pyrrol-1-yl)quinoxaline), PPyQX) has been synthesized via a facile bromine oxidation polymerization approach and employed as…
read more here.
Keywords:
anode material;
redox active;
hybrid flow;
aqueous hybrid ... See more keywords
Photo from wikipedia
Sign Up to like & get
recommendations!
1
Published in 2017 at "International Journal of Production Research"
DOI: 10.1080/00207543.2017.1324222
Abstract: Chinese tempered glass has entered a fast and stable growing era. To improve the productivity of tempered glass manufacturers, this paper investigates a scheduling problem in tempered glass production system, originated from a tempered glass…
read more here.
Keywords:
hybrid flow;
tempered glass;
three stage;
system ... See more keywords
Photo from wikipedia
Sign Up to like & get
recommendations!
0
Published in 2020 at "International Journal of Production Research"
DOI: 10.1080/00207543.2020.1851422
Abstract: Several approaches for strategic and tactical integration of supply chains considering the demand management process have been proposed in the literature. However, in the context of Industry 4.0, t...
read more here.
Keywords:
hybrid flow;
flow shop;
manufacturing services;
rescheduling contract ... See more keywords
Sign Up to like & get
recommendations!
2
Published in 2022 at "COPD: Journal of Chronic Obstructive Pulmonary Disease"
DOI: 10.1080/15412555.2022.2078695
Abstract: Abstract Background: Hypoxemia is currently treated in hospital wards with oxygen, released continuously by “conventional” flow meters. A new type of hybrid flow meter allows to switch between on-demand and continuous mode. The aim of…
read more here.
Keywords:
hybrid flow;
patient comfort;
demand;
flow meters ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2017 at "IEEE Access"
DOI: 10.1109/access.2017.2696118
Abstract: In this paper, we address the hybrid flow shop scheduling problem with multiprocessor tasks. The objective is to minimize the maximum completion time. This problem is encountered in manufacturing, parallel and distributed computing, and real-time…
read more here.
Keywords:
hybrid flow;
flow shop;
shop scheduling;
bound ... See more keywords
Photo from wikipedia
Sign Up to like & get
recommendations!
2
Published in 2023 at "IEEE Access"
DOI: 10.1109/access.2023.3269293
Abstract: For the green hybrid flow shop scheduling problem considering sequence dependent setup times (SDST) and transportation times, a mixed integer programming model is established with the objectives of minimizing the maximum completion time (makespan) and…
read more here.
Keywords:
problem;
flow shop;
hybrid flow;
sequence ... See more keywords
Photo from wikipedia
Sign Up to like & get
recommendations!
0
Published in 2018 at "IEEE Transactions on Engineering Management"
DOI: 10.1109/tem.2017.2774281
Abstract: Hybrid flow shop scheduling problem (HFSP) has been extensively discussed and the main objectives are related to completion time. The reduction of energy consumption should be considered fully in HFSP in the era of green…
read more here.
Keywords:
hybrid flow;
flow shop;
energy efficient;
energy ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2022 at "IEEE Transactions on Industrial Informatics"
DOI: 10.1109/tii.2021.3128405
Abstract: In this article, a distributed hybrid flow shop scheduling problem with variable speed constraints is considered. To solve it, a knowledge-based adaptive reference points multiobjective algorithm (KMOEA) is developed. In the proposed algorithm, each solution…
read more here.
Keywords:
distributed hybrid;
flow shop;
hybrid flow;
multiobjective algorithm ... See more keywords