Sign Up to like & get
recommendations!
0
Published in 2019 at "Soft Computing"
DOI: 10.1007/s00500-018-3447-8
Abstract: In this paper, a multi-objective hybrid flowshop rescheduling problem with respect to the production efficiency and instability is addressed in a dynamic shop environment, where two types of real-time events are simultaneously considered, i.e., machine…
read more here.
Keywords:
objective migrating;
problem;
flowshop rescheduling;
rescheduling problem ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2022 at "International Journal of Production Research"
DOI: 10.1080/00207543.2022.2093680
Abstract: ABSTRACT Lot streaming is the most widely used technique to facilitate the overlap of successive operations. Considering the consistent sublots and machine breakdown, this study investigates the multi-objective hybrid flowshop rescheduling problem with consistent sublots…
read more here.
Keywords:
problem;
multi objective;
consistent sublots;
decomposition ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2020 at "IEEE Access"
DOI: 10.1109/access.2020.2993881
Abstract: Hybrid flowshop scheduling problem with lot-streaming (HLFS) has played an important role in modern industrial systems. In this paper, we preset an improved migrating birds optimization (IMBO) algorithm for HLFS to minimize makespan. To ensure…
read more here.
Keywords:
problem;
flowshop scheduling;
hybrid flowshop;
scheduling problem ... See more keywords