Sign Up to like & get
recommendations!
1
Published in 2019 at "Structure and Infrastructure Engineering"
DOI: 10.1080/15732479.2019.1687528
Abstract: Abstract In order to evaluate the railway track geometry condition and plan maintenance activities, track inspection cars run over the track at specific times to monitor it and record geometry measurements. Applying an adequate inspection…
read more here.
Keywords:
geometry;
inspection intervals;
geometry condition;
track geometry ... See more keywords