Sign Up to like & get
recommendations!
0
Published in 2019 at "Geosystem Engineering"
DOI: 10.1080/12269328.2019.1644204
Abstract: ABSTRACT The modified isochronal well test is a deliverability test method suitable for gas wells in low-permeability gas reservoirs. Generally, the absolute open flow of gas wells is determined by modified isochronal well test, thereby…
read more here.
Keywords:
modified isochronal;
gas;
well test;
isochronal well ... See more keywords