Sign Up to like & get
recommendations!
2
Published in 2022 at "IEEE Transactions on Automation Science and Engineering"
DOI: 10.1109/tase.2020.3027532
Abstract: Wire rod and bar rolling is an important batch production process in steel production systems. A scheduling problem originated from this process is studied in this work by considering the constraints on sequence-dependent family setup…
read more here.
Keywords:
iterated greedy;
batch production;
problem;
production ... See more keywords
Sign Up to like & get
recommendations!
2
Published in 2022 at "IEEE Transactions on Automation Science and Engineering"
DOI: 10.1109/tase.2021.3062979
Abstract: In this study, we propose an efficient optimization algorithm that is a hybrid of the iterated greedy and simulated annealing algorithms (hereinafter, referred to as IGSA) to solve the flexible job shop scheduling problem with…
read more here.
Keywords:
problem;
hybrid iterated;
crane transportation;
crane ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2017 at "Scientia Iranica"
DOI: 10.24200/sci.2017.4434
Abstract: Public transport crew scheduling is a worldwide problem, which is NP-hard. This paper presents a new crew scheduling approach, called GRAVIG, which integrates grey relational analysis (GRA) into a Variable Iterated Greedy (VIG) algorithm. The…
read more here.
Keywords:
grey relational;
relational analysis;
iterated greedy;
crew scheduling ... See more keywords