Sign Up to like & get
recommendations!
1
Published in 2022 at "Transactions of the Institute of Measurement and Control"
DOI: 10.1177/01423312221105699
Abstract: During the synchronous operation of the double-container, the double-lift overhead cranes suffer from the perturbation of system internal parameters, friction and external unknown disturbances. To address the impact of the above-mentioned negative factors, based on…
read more here.
Keywords:
lift overhead;
system;
time;
double lift ... See more keywords