Sign Up to like & get
recommendations!
0
Published in 2025 at "Engineering, Construction and Architectural Management"
DOI: 10.1108/ecam-10-2024-1407
Abstract: PurposeIn the construction industry (CI), inaccurate loose material measurements pose waste and economic challenges, accounting for approximately one-third of project cost overruns, representing 60% of the overall construction costs. Current practices for measuring loose construction…
read more here.
Keywords:
system;
loose construction;
real time;
iot enabled ... See more keywords