Sign Up to like & get
recommendations!
0
Published in 2017 at "Journal of Manufacturing Systems"
DOI: 10.1016/j.jmsy.2017.04.018
Abstract: Abstract This paper deals with N-stage hybrid flow shop (HFS) lot streaming problem to develop a schedule that minimises the makespan. The HFS considered consists of one machine in each of the first (N-1) stages…
read more here.
Keywords:
hybrid flow;
lot streaming;
flow shop;
time ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2019 at "IEEE Access"
DOI: 10.1109/access.2018.2889373
Abstract: Blocking lot-streaming flow shop scheduling problem with the stochastic processing time has a wide range of applications in various industrial systems. However, this problem has not yet been well studied. In this paper, the above-mentioned…
read more here.
Keywords:
optimization;
shop scheduling;
flow shop;
lot streaming ... See more keywords
Sign Up to like & get
recommendations!
0
Published in 2020 at "IEEE Access"
DOI: 10.1109/access.2020.2993881
Abstract: Hybrid flowshop scheduling problem with lot-streaming (HLFS) has played an important role in modern industrial systems. In this paper, we preset an improved migrating birds optimization (IMBO) algorithm for HLFS to minimize makespan. To ensure…
read more here.
Keywords:
problem;
flowshop scheduling;
hybrid flowshop;
scheduling problem ... See more keywords
Sign Up to like & get
recommendations!
2
Published in 2023 at "IEEE Transactions on Automation Science and Engineering"
DOI: 10.1109/tase.2022.3151648
Abstract: This paper addresses a distributed lot-streaming permutation flow shop scheduling problem that has various applications in real-life manufacturing systems. We aim to optimally assign jobs to multiple distributed factories and sequence them to minimize the…
read more here.
Keywords:
lot streaming;
flow shop;
distributed lot;
streaming permutation ... See more keywords
Sign Up to like & get
recommendations!
1
Published in 2022 at "Algorithms"
DOI: 10.3390/a15070246
Abstract: The work in this paper is motivated by a recently published article in which the authors developed an efficient two-stage genetic algorithm for a comprehensive model of a flexible job-shop scheduling problem (FJSP). In this…
read more here.
Keywords:
lot streaming;
multi objective;
two stage;
genetic algorithm ... See more keywords